Production detailing
Approved design to buildable shop drawings.
On site: checked against the survey before cutting.
Furniture & Fitout Production
Wall bays, shelving, counters, mid-floor units and furniture in wood, metal and mixed materials. Installed and finished by our site teams. One 21-day prototype or a national roll-out.
Twin serviceGeneral Contracting, built on site →Production leads
So we make fixtures in-house and trial-assemble every piece. Then our site teams install, align and finish it in the store.
Ends on site: installed and finished by our site teams.
What's included · drawing to installed fixture
Approved design to buildable shop drawings.
On site: checked against the survey before cutting.
Every unit a store stands on.
On site: fitted to the finished walls and floor.
Repeatable precision, unit after unit.
On site: parts that fit first time.
Frames, rails and brackets made in-house.
On site: bolted to rails, levelled, aligned.
Matched to the brand's approved samples.
On site: touch-ups by our site carpenters.
Rollout fixtures kitted and dispatched to site.
On site: unpacked, installed, snagged, handed over.
Where the workshop line ends: in your store.
Handed over with the store, on one date.
Twin services · two tracks, one date
Furniture & Fitout and General Contracting run in parallel, then meet at install. One contract, one accountable date.
Prototype · week by week
21days
Rates agreed, then a full prototype. Signed off, then the roll-out.
Shop drawings, materials, finishes approved.
Made in our workshops, QC at each stage.
Assembled, finished, reviewed with your team.
Then on site: the approved prototype sets the standard our site teams install to.
The order, every time. Rates are agreed before the prototype is made, so no effort or money goes into a prototype that can't be priced.
How we deliver
Fitout timelines depend on prototype scope and quantities, set per project at estimate.
Shop drawings, materials, finishes and rates agreed.
Gate: Drawings approvedFull sample fixture in 21 days.
Gate: Prototype signed offBatches tracked live.
Gate: QC passedTrial assembly, protective packing, planned dispatch.
Gate: Dispatch checklistOur site teams install, align, finish, hand over.
Gate: Install sign-offSee the 16 gated stages → How our site teams build the store →
Materials we specialise in
On site: edges, shutters and touch-ups finished by our site carpenters.
Where it applies
Batch-produced in our own workshops, kitted and dispatched to stores in step with our site teams. We deliver and install anywhere in India.
On site: every store installed and finished to the same standard.
Beyond retail: we also build offices, hospitals, clinics and hotels. Commercial Interiors →
Campaign fixtures and POSM? See POSM Fixtures →
Built by us
Photos from our own projects: fixtures and joinery from our production floor, installed in store.
Birkenstock · footwear



TekEasy · consumer electronics



Asian Paints · Colour Cube and Colour Ideas stores (paints division)



Own workshops and our nationwide network: three HQs with fit-out and signage production, a central warehouse and 18 Satellite Centres.
Drawing, prototype, QC and dispatch gates. Problems fixed in the workshop.
Workshop and site teams on one programme. Safety strictly followed.
It depends on prototype scope, quantities and finishes. We set the timeline per project at estimate. The prototype itself takes 21 days.
Both. Our site teams install and finish what we make. Or we supply only and another contractor installs.
Time = Money
One team on site and in the workshop, one contract, and a date we hold.