System, process & timelines

Two tracks. Every gate. One date.

Our site teams build while our workshops make. 16 gated stages, two lanes in parallel, merging at install and handover.

Let's Talk

Why a system matters

Retail rollouts fail in the gaps between vendors. We close the gaps.

Four vendors means four schedules and nobody owning the opening date. We run site and workshop on one process, under one contract, with one team answerable for it.

The OmG Standard →

16gated stages · none skipped

Master business cycle · two tracks, one date

16 gated stages. Two lanes, in parallel.

Our site teams build the store while our workshops make what goes in it. The lanes meet at install and handover. No gate skipped.

Start together
  1. 01Enquiry & brief

    Brand, format, sites, scope, budget band, dates.

    Gate: brief logged
  2. 02NDA

    Signed before drawings or launch details are shared.

    Gate: NDA executed
Surveyor measuring a bare shell with a laser distance meterSite lane
  1. 03Site survey / recce

    Measurements, services, access, mall rules.

    Gate: survey report shared
Inspector checking a finished counter against a finish sampleWorkshop lane
  1. 04Concept & drawings

    Layouts, design adaptation, shop drawings.

    Gate: drawings approved
Commit together
  1. 05BOQ & estimate

    BOQ, specifications, timeline set per project. Two routes: we match your approved rate card, or price your BOQ on ours.

    Gate: BOQ & timeline agreed
  2. 06Approval, PO & advance

    Advance as per contract; the clock starts.

    Gate: PO received

Fit-outs, stages 04–06: rates are agreed before the prototype is made, so no effort or money goes into a prototype that can't be priced.

  1. Rate alignment
  2. Prototype production
  3. Prototype approved
  4. PO
  5. Roll-outapproved prototype, store by store
  6. Invoice
  7. Payment
Site lane
  1. 07Mall / landlord / permit approvals

    Submissions and work permissions.

    Gate: permission to start
  2. 10Safety induction & site execution

    Every site team inducted. Our site teams and specialist partners build in sequence:

    • Civil & MEP
    • Ceilings, flooring, walls, paint
    • On-site carpentry & finishing
    Gate: induction recorded
Site supervisor giving a safety induction to the site team
Workshop lane
  1. 08Production & procurement

    Made in our workshops or procured to spec, QC at each stage.

    Gate: QC passed before dispatch
  2. 09Dispatch & logistics

    Packed, documented, timed to site readiness and mall access.

    Gate: delivery confirmed on site
Wrapped fixtures loaded onto a truck at dawn, checklist in hand
Across both lanes, every day
  1. 11Daily reporting on OmG Command Centre

    Site progress and workshop status: photos, issues, next steps.

    Gate: daily report filed
Wrapped fixtures wheeled into a store as the ceiling team finishes on a scaffold
Lanes meetFixtures arrive. Our site teams install.
  1. 12Snags & handover

    Joint snag walk, as-built drawings, documents.

    Gate: handover signed
Open, prove, support
  1. 13Audit

    Measurement and quality against BOQ and drawings.

    Gate: audit closed
  2. 14Invoice

    GST invoicing on audited scope and milestones.

    Gate: invoice accepted
  3. 15Payment

    Balance released as per contract.

    Gate: account settled
  4. 16Warranty / AMC & feedback

    Warranty as agreed, AMC on request, service by our site teams and specialist partners across India. Feedback for the next store.

    Gate: feedback captured
Technician carrying out a maintenance check in a busy store
Shutter up on a finished store at night as the team walks the final snag list
Gate 12 · Handover signedShutter up. Ready to trade.

95%+of projects handed over on or before the due date.

How we can work with you

Pick the model. Or mix them.

Full turnkey is one way. These are the others clients ask for most.

Kitted & dispatched

Rollout fixtures made in our own workshops, kitted and dispatched to site.

Supply only

We make and deliver. Another contractor installs.

On site through your show

Our site teams and specialist partners stay on site while the show runs.

Exhibitions →

21-day prototype plan

A week-by-week plan, start to finish in 21 days.

See the plan →

We work on all permutations and combinations depending on the client's need.

With a decent volume of business we can also build a dedicated team line exclusively for a client.

Who does what

Clear roles, from day one

A simplified view. Exact responsibilities are written into each contract.

ActivityOmG Retail iQClient
Brief, brand guidelines, target datesConsults and recordsProvides
Site survey and recceCarries outGives site access
Drawings, design adaptation, BOQPreparesReviews and approves
PO and milestone paymentsInvoices as per contractIssues and releases
Mall, landlord and permit approvalsPrepares submissions, coordinatesLease and brand documents
Production, procurement and QCOwnsOptional inspection
Dispatch, logistics and installationOwnsInformed via daily reports
Site safetyOwns for OmG site teams and partnersShares site rules
Daily reportingPublishes on OmG Command CentreReviews, flags issues
Snag walk and handoverCloses snags, hands over documentsJoins walk, signs handover
Warranty and AMCSupports as agreedRaises requests

Questions on payment milestones, warranty, documents or safety? Read the Procurement FAQ →

Time = Money

Every day a store opens late is revenue that never comes back.

One team on site and in the workshop, one contract, and a date we hold.

Quick briefThree fields. We call you back.

Service

Have drawings? Add them next (optional)

WhatsApp OmG Retail iQ

What do you need delivered?

Opens WhatsApp with your message ready to send to +91 73493 50300.